Just everyday life with 3 crazy kids(or whatever Pokemon characters they happen to be today), 1 husband, 4 fish, 1 cat and 1 dog!
Sunday, October 31, 2010
Halloween
Saturday, October 30, 2010
Pumpkin Carving
After the pumpkins were all carved we roasted the seeds and enjoyed them while we watched the Gator game!
Roasted Pumpkin Seeds
Wednesday, October 27, 2010
The Well is Fixed
Monday, October 25, 2010
Ugghh... More Troubles
Sunday, October 24, 2010
Extreme Makeover Home Edition
The first time the parade passed we had a silent parade. The girls danced to no music. The marching band looked like it was playing but no sound was coming out. The crowd clapped silently. Then we waited...
Second take...
Wednesday, October 20, 2010
Home Today
Sunday, October 17, 2010
Pool/Subbing Updates
Monday, October 11, 2010
Subbing
Friday, October 8, 2010
MORE Pool Stuff
Update on the Pool Project
- Forget the pool and do nothing. The problem with that is we figure eventually the HD will come back and cite us for the line being to close to the well and have to fix it anyway.
- Move the line. That will not only involve a lot of time waiting for permit to move, hiring a company to do it, and doing the job but the cost is also hard to predict because we will have to upgrade the system to meet any new standard interpretations.
- Kill the well and leave the pool in the newly marked location. Then we will hopefully be able to go back later and drill a new well.
I called the company that originally drilled the well to see if they kept records as to where septic lines were when the well was drilled. (The septic company that installed the system had a fire and was then bought out by another company so no records.) I asked the well company for records and a quote on killing the well. The owner told me he would bet me $100 that the HD is wrong about the line placement because they never would have put a well that close to the drain field.
Wayne called the HD inspector who inspected the septic system when we bought the house to find out what he could tell us. When that inspection was done one of the things they were to check for was proximity of the drain lines to any wells! He said from his records there should be 3 lines running from our septic tank and 2 lines running from our grey water tank so the lines shouldn't run 140ft to the well.
So... the well guy is coming out today and the 2 inspectors at the HD are supposed to talk to each other. Our pool is supposed to go in Oct. 23rd so- fingers crossed!
Saturday, October 2, 2010
A Walk in the Woods
T, "I knew this was the right one, I heard you."